• Nursing Exams
  • HESI A2 EXAMS
  • Finance and Insurance
  • NCLEX EXAM
  • Real Estate
  • Business
  • Medical Technology
  • Counseling and Social Work
  • English Language
  • Graduate and Professional School
  • CAREER EXAMS
  • Medical Professional
  • K 12 EXAMS
  • Personal Fitness
  • Public Service and Legal
  • Teaching
  • Nutrition
  • Construction and Industry
  • Test

d. Extend boom correct answers c.

English Language Dec 7, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

  • What action does a signal person intend the operator to perform if he extends his arm at
  • shoulder height, makes a fist with his hand, and sticks his/her thumb up?

  • Boom down
  • Swing
  • Boom up
  • Extend boom correct answers c.
  • When hoisting personnel, within what percentage of level must a telescopic boom crane be in
  • order for the gross ratings in the load chart to remain valid?

  • 1%
  • 2%
  • 5%
  • 8% correct answers a.
  • The load line of the crane you're operating contacts an energized power line. There's no sign of
  • any other danger, such as fire. What should you do?

  • Climb down carefully from the crane cab
  • Jump down, feet together
  • Stay in the cab until the lines are de-energized
  • Get as far away from the crane as possible correct answers c.
  • According to OSHA 1926.1413, how many randomly distributed broken wires in rotation-
  • resistant rope are cause for replacement of the rope?

  • 1 broken wire in 6 rope diameters
  • 2 broken wires in 30 rope diameters
  • 3 broken wires in one strand in one lay
  • 2 broken wires in 6 rope diameters correct answers d.
  • What is the net capacity of a crane on main boom unless the manufacturer states otherwise?
  • The capacity listed in the load chart minus the weight of the rigging and all attachments
  • The capacity listed in the load chart plus the weight of the rigging and all attachments
  • The capacity listed in the load chart minus the weight of the rigging and all attachments not in
  • use

  • The capacity listed in the load chart minus the weight of the rigging alone correct answers a.
  • What may happen to a properly rigged load when lifted off the ground unless the operator
  • takes account of boom deflection?

  • It could swing out away from the crane
  • It could swing in towards the crane
  • It could raise absolutely vertically
  • It could shift in its rigging correct answers a.

NCCCO MOBILE CRANE EXAM QUESTIONS AND

ANSWERS LATEST / (100% CORRECT) 1 / 2

  • What Standard Method hand signal is being illustrated?
  • Swing
  • Stop
  • Emergency Stop
  • Travel correct answers a.
  • Who should an operator respond to a "stop" signal from?
  • Appointed signal person only
  • Project manager only
  • Superintendent only
  • Anyone correct answers d.
  • Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless
  • the manufacturer states otherwise?

  • The side
  • The rear
  • The front
  • The outriggers correct answers c.
  • What is the definition of "operating radius?"
  • The distance from the base of the boom to the center of the load b. The distance from the front
  • of the crane to the center of gravity of the load

  • The distance from the center of rotation of the crane to the center of the load
  • The distance from the center of rotation of the crane to the center of gravity of the load correct
  • answers d.

  • What applies to the capacities below the bold line shown on a load chart?
  • They are based on the structural strength of the crane
  • They must not be used
  • They are based on the stability of the crane
  • They should only be used if the crane is set up on outriggers correct answers c.
  • In which quadrant are rough terrain crane capacities generally greater?
  • Over the front
  • Over the rear
  • Over the right side
  • Over the left side correct answers a.
  • According to federal requirements, under what conditions is it okay for a person to ride the
  • headache ball?

  • When there is no other way to gain access
  • When the lift has been approved by an engineer
  • When other means would be more dangerous
  • It is never okay correct answers d.
  • / 2

Download Document

Buy This Document

$1.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration
OR
English Language Study Materials
1.00/10 days
  • Full access to all English Language documents
  • Access for 10 days
  • Study materials and practice papers
Purchase Membership
Get download access to all English Language documents

Document Information

Category: English Language
Added: Dec 7, 2025
Description:

1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom u...